Prologis

WAREHOUSE FACILITY

  • Keeping the future in mind. This warehouse was designed to include the option to have the space be used by Prologis as well as being white boxed for future tenants.
  • The mechanical systems we designed consisted of eleven new gas-fired heaters and eight new smoke purge fans. The electrical system design included new tenant and house distribution panels feed off of the existing utility service, as well as the lighting control system design for the new light fixtures provided throughout the warehouse.
  • Our plumbing team designed a new gas booster pump system, utilizing the existing low pressure gas service to supply the new heating system. We also demolished the old fire alarm system and replaced it with a new addressable system serving the entire building.