Nixon Peabody

Working together from design to commissioning

Law firms are a special type of client, with very specific requirements for technology, employee comfort, and energy efficiency. For this 25,000 sq. ft. expansion project for Nixon Peabody, our engineering, technology and commissioning teams worked together to make sure we met those requirements.

Our technology team designed three new telecom rooms. This included the replacement of all communications cabling on three floors, relocating the existing server room, and the installing new backbone cabling from the new server room to six telecommunications rooms. 

As part of this project, Nixon Peabody also migrated to a new voice over IP telephone system. What made this more interesting was that the majority of the work was conducted in a live occupied environment to prevent any downtime. Our technology team was responsible for project management and the coordination of all installation and relocation activities.

Our commissioning team worked closely with our MEP engineering team to commission the MEP systems for LEED LEED certification. We focused on long-term energy and maintenance cost reductions and were able to realize many opportunities for Nixon Peabody to save energy and maintenance costs. For example, WB was able to help Nixon Peabody reduce energy costs by making modifications to the IT cooling system. By implementing our recommended changes, noise levels and energy consumption were decreased. This meant a savings and a quieter workspace.

Project Type
Interiors
Client
Location
New York, NY
Architect
Mancini Duffy
Square Footage
25,000
LEED Certification Level
Silver

Project Services

Electrical (Interiors)

Prepared electrical lighting drawings for fixture circuiting, specification and switching. Prepared power drawings with circuiting, panels, transformers, exit signs and emergency lighting.

Fire Alarm (Interiors)

Prepared drawings showing selections and locations for ADA compliant audible and visual fire alarm devices.

Fire Protection (Interiors)

Prepared drawings showing distribution piping and locations of sprinkler heads, preaction and/or FM 200 systems.

Fundamental Commissioning

Working as the owner’s advocate to fulfill the Fundamental Commissioning Pre-Requisite for LEED Certification, ensured that the MEP systems were installed and operate as described in the contract documents.

LEED

Designed MEP systems in compliance with the LEED certification requirements. Performed calculations and provided submittals, drawings and narratives for all MEP pre-requisites and credits, as required by the USGBC.

Mechanical (Interiors)

Designed HVAC systems including transfer fans, environmental requirements, controls and management systems.

Plumbing (Interiors)

Designed plumbing fixture locations and rough-in requirements.

Technology Consulting

Designed a technology infrastructure, and coordinated performance and layout requirements with business and related technology plans. Addressed equipment spatial requirements, pathways, bandwidth, cabling systems, performance, systems administration, equipment refresh impacts, and ROI analysis on specified infrastructures.