Rapid7 Corporate Technology, a leading security software company, needed to relocate its headquarters to hold the capacity of 250-300 employees. This project included complete MEP/FP/IT engineering services on the on two floors at 100 Summer Street.

Some of the major elements of this project include an interconnecting staircase between the two floors and reconfiguring a portion of the space to include a multipurpose room/cafeteria. The challenges included the coordination of MEP systems within extensive area of open ceilings to meet the architect’s design aesthetics.