With the intent to expand and build out additional unoccupied space adjacent to their current space, the renovations to our client’s office space included a large operations center, operations conference center, product analysis center, and office space.

Our design included a new generator for the server room in order to ensure uninterrupted operation for the client’s business. Our design of the perimeter cyber center area met the general secured facility design and construction specification.