We provided MEP/FP design services for a warehouse that was being converted into two separate spaces for different tenants. The smaller space consisted of 100,000 sq. ft. and the larger space was 620,000 sq. ft.

A site survey of the proposed space identified the existing conditions that would contribute to operational issues. We reused much of the existing equipment in combination with new to replace the equipment that was not functioning properly. Our mechanical team designed a ventilation system for the truck exhaust to accommodate a new drive isle for trucks down the center of the warehouse.