Our team worked with the National Building Museum to design and construct nine air handling units (AHUs) and associated infrastructure serving the Museums first floor gallery space.

We replaced the existing AHUs, located around the perimeter of the building, with new HVAC units with steam to steam humidification. This required the reuse of the existing steam lines and installation of new domestic cold water piping and heating hot water piping to fee the individual HVAC units.