Our team worked with Kanyos Bio on the relocation of their office and laboratory.

We designed a new HVAC system for the space and supplemental cooling units. Our electrical engineers designed power for lighting, furniture, equipment, receptacles and emergency lighting as well as a lighting control system. Our scope also included standby power distribution, which includes a UPS system and feeders.

We are incorporating the design for all of the specialty systems required in a laboratory environment including air, specialty gases, natural gas, vacuum, acid waste, and processed water into our MEP/FP construction documents.