We supported ARINC at their Riva Road campus in their efforts to provide a new Central Utility Plant to serve their campus. This included a new two story building addition and new 480V electrical services upgrade. The CUP facility houses new 480V electrical Switchgear equipment, new N+1 1.0MW UPS systems, new fire suppression systems as well as new/reused HVAC systems necessary to support the electrical equipment.

We also designed two new exterior 600KW-1.2MW diesel generators with a 10,000 gallon above-ground fuel oil storage tanks to provide 72-hours of run time for the new generator plant.