Show drawer

1 of 5

Hospitality

Next:Project Title

Headquarters Hotel

Completing a renovation without affecting hotel operations

Renovating a hotel usually means that the work has to be done in strategic phases so as to not interrupt hotel operations. That was certainly the case for this project which was done in five phases. The renovation included improvements to the lobby, two large ballrooms, and meeting rooms.

To accommodate the new ceiling structure, WB adjusted and updated the existing mechanical and electrical systems. We also surveyed the sprinkler layout and made the system adjustments needed to provide code compliance.

In addition, we provided telecommunications and audio visual design for the public spaces. This included the design of telephone and data connections, as well as A/V speakers, amplifiers and microphone mixer systems.

Project Type
Hospitality
Client
Location
Morristown, NY
Architect
CMMI

Project Services

Electrical (Interiors)

Prepared electrical lighting drawings for fixture circuiting, specification and switching. Prepared power drawings with circuiting, panels, transformers, exit signs and emergency lighting.

Fire Alarm (Interiors)

Prepared drawings showing selections and locations for ADA compliant audible and visual fire alarm devices.

Fire Protection (Interiors)

Prepared drawings showing distribution piping and locations of sprinkler heads, preaction and/or FM 200 systems.

Mechanical (Interiors)

Designed HVAC systems including transfer fans, environmental requirements, controls and management systems.

Plumbing (Interiors)

Designed plumbing fixture locations and rough-in requirements.

Technology Consulting

Designed a technology infrastructure, and coordinated performance and layout requirements with business and related technology plans. Addressed equipment spatial requirements, pathways, bandwidth, cabling systems, performance, systems administration, equipment refresh impacts, and ROI analysis on specified infrastructures.